FRWA Folsom Canal Goose Creek – Folsom, Ca


ATS was brought on by FRWA to conduct pH adjustment for hydrostatic testing.  ATS installed a 1,000 GPM treatment system along with an 18,000 gallon open top tank.FRWA-goose-creek

Water was pumped from a drain vault north of Goose Creek through the ATS monitoring and Treatment System and into an 18,000 gallon tank.   Citric Acid was injected through the treatment system to adjust pH.  Once the water in the tank met quality standards the water was then release into Goose Creek.  A total of 2,097,309 gallons of water from the pipeline drain vault was monitored, treated, and discharged.